Guangzhou Opal Machinery Parts Operation Department vivianwenwen8@gmail.com 86-135-33728134
Product Details
Place of Origin: China
Brand Name: OUB
Certification: ISO9001
Model Number: 561-15-59110
Payment & Shipping Terms
Minimum Order Quantity: 10
Price: Negotiable
Packaging Details: PP Bag Inside.outer is carton with film wrapped.
Delivery Time: Within 5-15 days after getting your desposit
Payment Terms: L/C,D/A,D/P,T/T,Western Union
Supply Ability: 1000Pcs
Part No.:: |
561-15-59110 |
Part Name:: |
SEAL RING |
Model: |
HD325-7R |
Machine: |
Bulldozer |
Material: |
High Rigidity Modified PA6 Cast Nylon |
Color: |
COPPER |
Install Parts: |
TRANSMISSION BARE (3/5) (REAR AND FRONT HOUSING) |
Part No.:: |
561-15-59110 |
Part Name:: |
SEAL RING |
Model: |
HD325-7R |
Machine: |
Bulldozer |
Material: |
High Rigidity Modified PA6 Cast Nylon |
Color: |
COPPER |
Install Parts: |
TRANSMISSION BARE (3/5) (REAR AND FRONT HOUSING) |
1. Quick Details of seal 561-15-59110:
| Part NO. | 561-15-59110 |
| Machine | Bulldozer |
| Size | OEM |
| Material | High rigidity modified PA6 cast nylon |
| Type | RING SEAL |
2. 561-15-59110 parts on group :
![]()
| NO. | PART NO. | PRAT NAME | QTY |
| 1 | 198-15-21160 | HOUSING,REAR | 1 |
| 2 | 145-14-11320 | PLUG | 2 |
| 3 | 19M-15-19210 | RING,SEAL (K2) | 1 |
| 4 | 198-15-22770 | PISTON | 1 |
| 5 | 198-15-29210 | RING,SEAL (K2) | 1 |
| 6 | 04020-01842 | PIN,DOWEL | 2 |
| 7 | 198-15-22971 | SPRING | 12 |
| 8 | 198-15-01180 | HOUSING ASSEMBLY | 1 |
| 9 | 07043-70312 | PLUG | 2 |
| 10 | 561-15-59110 | RING,SEAL | 1 |
| 11 | 198-15-21250 | BOLT | 17 |
| 12 | 566-15-11250 | WASHER | 17 |
| 13 | 198-15-22710 | DISC | 14 |
| 14 | 198-15-22720 | PLATE | 12 |
| 15 | 195-15-12880 | SPRING | 84 |
| 16 | 198-15-22210 | GEAR | 1 |
| 17 | 198-15-22610 | GEAR,RING | 1 |
| 18 | 198-15-22310 | CARRIER | 1 |
| 19 | 198-15-22410 | GEAR | 4 |
| 20 | 198-15-32510 | SHAFT | 4 |
| 21 | 04260-00635 | BALL | 4 |
| 22 | 198-15-39411 | BEARING | 4 |
| 23 | 09233-14520 | WASHER,THRUST | 8 |
| 24 | 01010-61445 | BOLT | 18 |
| 25 | 01643-31445 | WASHER | 18 |
| 26 | 198-15-32860 | COVER | 1 |
| 27 | 01010-81235 | BOLT | 6 |
| 28 | 01643-31232 | WASHER | 6 |
| 29 | 198-15-42150 | COLLAR | 1 |
| 30 | 06040-06926 | BEARING | 2 |
| 31 | 198-15-22220 | GEAR, 39 TEETH | 1 |
| 32 | 198-15-22230 | GEAR, 39 TEETH | 1 |
| 33 | 198-15-22620 | GEAR, 89-140 TEETH,RING | 1 |
| 34 | 198-15-29510 | RING | 1 |
| 35 | 198-15-22630 | GEAR, 89-140 TEETH,RING | 1 |
3. 561-15-59110 picture:
![]()
4. Service part number :
| PART NO. | PART NO. | Part NO. |
| 707-98-36740 | 707-98-56640 | 707-98-56640 |
| 707-51-13030 | 707-51-13130 | 707-51-12110 |
| 707-98-58240 | 707-98-58240 | 707-99-44230 |
| 707-98-60100 | 707-98-60100 | 707-99-44270 |
| 707-98-60110 | 707-98-60110 | 707-99-44280 |
| 707-98-60120 | 707-98-60120 | 707-99-44290 |
| 707-98-60121 | 707-98-60121 | 707-99-44310 |
| 707-98-61100 | 707-98-61100 | 707-99-44340 |
| 707-98-60110 | 707-98-60110 | 707-99-44280 |
| 707-98-60120 | 707-98-60120 | 707-99-44290 |
| 707-98-60121 | 707-98-60121 | 707-99-44310 |
| 707-98-61100 | 707-98-61100 | 707-99-44340 |
| 707-98-26441 | 707-98-37610 | 707-98-60121 |
| 707-98-26450 | 707-98-37620 | 707-98-61100 |
| 707-98-61100 | 707-98-61100 | 707-99-44340 |
5. FAQ
Q: Which heavy-duty bulldozer model adopts this piston seal ring 561-15-59110, and what bidirectional hydraulic sealing capacity can this three-piece composite piston seal realize inside the torque converter hydraulic piston chamber?
A: This factory genuine OEM piston seal ring marked 561-15-59110 is exclusively matched for D85EX-18 heavy mining bulldozers, installed on the pressure control piston inside the torque converter hydraulic cavity. The torque converter piston bears continuous bidirectional reciprocating stroke under long-duration stable high hydraulic pressure during open-pit mine rock pushing, large-area land leveling and heavy waste soil stripping construction operations. It withstands frequent instantaneous pressure surges caused by uneven ground bumping, long-term mixed erosion of high-temperature torque converter oil and tiny metal friction debris, as well as all-year outdoor extreme temperature alternations between high-altitude freezing winter mine sites and non-stop full-load high-temperature summer operation. This three-in-one integrated composite piston seal assembly consists of a carbon fiber filled PTFE main sliding seal ring, double-sided rigid PA6 anti-extrusion back-up rings and an oil-resistant HNBR elastic energizer, achieving stable bidirectional fluid isolation inside the torque converter cavity. It effectively blocks high-pressure hydraulic oil from cross-flowing on both sides of the piston to avoid torque converter power loss, slow vehicle response and walking power attenuation; the paired rigid back-up rings prevent the soft PTFE sealing main body from being squeezed into tiny piston groove gaps under peak pressure impact, while the built-in HNBR energizer provides lasting radial pre-tightening force to automatically compensate micro abrasion generated by millions of reciprocating strokes of the PTFE ring. All components adopt exclusive matching dimensional standards and cannot be mixed with other model seals, suitable for full torque converter disassembly maintenance at large open-pit bulldozer repair yards and comprehensive heavy construction machinery service stations, greatly cutting unexpected equipment downtime caused by internal torque converter seal leakage.
Q: What unique three-material composite sealing advantages does this carbon fiber PTFE piston seal ring possess compared with single PU or NBR rubber piston seals supplied by aftermarket dealers for D85EX-18 bulldozer torque converters?
A: The torque converter piston of D85EX-18 heavy bulldozers reciprocates millions of times every month under sustained 29–36Mpa high hydraulic pressure, fully soaked in high-temperature anti-wear torque converter oil mixed with hard metal fine particles all year round, and exposed to cold-hot alternating working environments with huge temperature difference. Carbon fiber reinforced modified PTFE main sealing body has ultra-low friction coefficient, ultra-high compressive strength and anti-hard particle scratch performance that ordinary single NBR or PU rubber cannot match; evenly distributed carbon fiber inside PTFE forms a permanent self-lubricating protective layer during reciprocating sliding, thoroughly eliminating dry friction scratches between the seal and cylinder inner wall, and will not swell, soften or produce permanent compression deformation after long-term immersion in high-temperature torque converter oil above 128℃. Double-sided high-rigidity modified PA6 cast nylon anti-extrusion back-up rings have ultra-high compressive hardness, which can bear instantaneous peak pressure impact without bending, cracking or permanent distortion, fundamentally solving the extrusion failure defect of single rubber seals under long-term heavy pressure. The HNBR elastic energizer maintains stable elastic tension at ultra-low ambient temperature down to -42℃, avoiding seal loosening and internal oil leakage caused by ordinary rubber hardening and elasticity loss in high-altitude winter mine construction sites. This targeted matched three-material composite structure extends the overall service life of the piston seal by more than 94% compared with ordinary single rubber piston seals, and effectively reduces repeated replacement labor and spare parts procurement costs for mine fleet operators.
Q: How can on-site professional heavy bulldozer maintenance technicians rapidly distinguish each component of this 561-15-59110 piston seal ring set via exclusive color, surface texture and structural shape features?
A: The carbon fiber filled PTFE main piston sealing ring is uniform dark gray matte solid split ring with fine carbon fiber grain texture on the surface, smooth sliding surface without sticky rubber touch, and adopts symmetrical rectangular cross-section specially designed for bidirectional torque converter hydraulic sealing. Two independent high-rigidity PA6 anti-extrusion back-up rings are pale beige hard thin split rings with obvious rigid plastic texture, harder, lighter and smoother than all rubber materials, separately arranged on both sides of the PTFE main ring to block extrusion gaps. The matched HNBR elastic energizer O-ring is matte black elastic circular rubber part with soft elastic touch, embedded into the inner circular groove of the PTFE ring to provide continuous radial tightening tension. Every single sealing component is carved with miniature micro laser engraved dimension identification codes corresponding to D85EX-18 torque converter piston groove standard parameters, supporting one-to-one fast sorting and accurate matching during full torque converter disassembly overhaul work. Inferior single rubber replacement seals have no independent hard anti-extrusion back-up rings, the surface is covered with thick residual release agent showing sticky texture, integrated single black rubber structure without split auxiliary rings, and lack clear laser size marking codes on each independent accessory.
Q: What complete range of pressure, reciprocating speed and temperature working limit conditions can this three-material composite piston seal ring withstand to maintain long-term stable zero-leakage torque converter sealing for D85EX-18 heavy bulldozers?
A: This complete piston seal ring assembly can continuously and stably work under stable torque converter hydraulic pressure of 29–36Mpa, and withstand repeated instantaneous uneven ground bump peak pressure surges up to 43Mpa without extrusion deformation, PTFE ring scratch damage or energizer elastic fatigue failure. The maximum allowable piston reciprocating sliding speed reaches 0.85m/s, perfectly adapting to frequent fast forward-reverse shifting of full-load mine bulldozers. The stable applicable working temperature range covers -42°C ~ +140°C, fully matching ultra-low temperature cold startup of high-altitude alpine open-pit mines in winter and long-hour continuous high-temperature torque converter operation under full pushing load in hot summer months. Carbon fiber filled PTFE main ring, PA6 rigid back-up rings and HNBR oil-resistant energizer all resist thermal aging, cold hardening and particle abrasion after tens of millions of reciprocating cycles and repeated drastic cold-hot alternations, maintaining zero internal cross-leakage of torque converter hydraulic oil all year round. The split back-up ring special design also blocks tiny metal wear debris from directly scratching the main PTFE sealing sliding surface, effectively reducing abnormal torque converter response lag, power drop and walking vibration faults caused by premature seal wear.
Q: What hidden torque converter core failure risks and corresponding tangible comprehensive economic losses will large open-pit mine fleet managers face if cheap single rubber piston seals replace this composite 561-15-59110 piston seal ring?
A: Low-cost single NBR/PU rubber piston seals lack rigid PA6 anti-extrusion back-up rings and self-lubricating carbon fiber filled PTFE main sliding body, only relying on ordinary single-layer rubber for sealing. Under long-term high torque converter pressure and frequent high-speed reciprocating sliding, the thin rubber sealing body will quickly produce unilateral extrusion damage, deep surface scratches and permanent compression set deformation, leading to continuous internal cross-leakage of hydraulic oil inside the torque converter cavity. The D85EX-18 heavy bulldozer will show obvious slow vehicle response, insufficient walking traction, frequent torque converter overheating alarm signals, accompanied by harsh irregular metal impact vibration noise during each forward-reverse switching action. A large number of broken micro rubber debris peeled from worn inferior seals will circulate inside the closed torque converter hydraulic loop, blocking precision control valve spools and deeply scratching the high-precision honed piston cylinder inner wall, resulting in extremely expensive overhaul costs including cylinder secondary honing, full torque converter valve group replacement and complete torque converter oil drainage & full refilling. Frequent unexpected long-term equipment shutdown will interrupt large open-pit mine ore pushing, terrain leveling and waste soil transportation construction schedules, bringing massive additional overtime labor wages and high idle heavy bulldozer equipment rental loss fees. Severe complete seal failure may even cause sudden torque converter walking stall during downhill heavy ore pushing operations, bringing major equipment collision and construction site safety hazards.
6. Exhibition and Wearhous
![]()
![]()
![]()
Oil seals,Hydraulic Seals, Cylinders Seal Kits, And More