logo

Guangzhou Opal Machinery Parts Operation Department vivianwenwen8@gmail.com 86-135-33728134

Guangzhou Opal Machinery Parts Operation Department Company Profile
Products
Home > Products > Oil Seal Kits > 07011-00032 0701100032 HNBR PU FKM Carbon Filled PTFE Multi-Material Composite Oil Seal Kit for Bulldozer Transmission Flow Distribution Valve Complete Overhaul Servicing S6D155-4C

07011-00032 0701100032 HNBR PU FKM Carbon Filled PTFE Multi-Material Composite Oil Seal Kit for Bulldozer Transmission Flow Distribution Valve Complete Overhaul Servicing S6D155-4C

Product Details

Place of Origin: China

Brand Name: OUB

Certification: ISO9001

Model Number: 07011-00032

Payment & Shipping Terms

Minimum Order Quantity: 10

Price: Negotiable

Packaging Details: PP Bag Inside.outer is carton with film wrapped.

Delivery Time: Within 5-15 days after getting your desposit

Payment Terms: L/C,D/A,D/P,T/T,Western Union

Supply Ability: 1000Pcs

Get Best Price
Product Details
Highlight:

HNBR PU FKM oil seal kit

,

Carbon Filled PTFE oil seal

,

Bulldozer transmission oil seal kit

Part No.::
07011-00032
Part Name::
SEAL LIP
Model:
GD30-5M
Machine:
Bulldozer
Material:
PU
Color:
BLACK
Part No.::
07011-00032
Part Name::
SEAL LIP
Model:
GD30-5M
Machine:
Bulldozer
Material:
PU
Color:
BLACK
Product Description

1. Quick Details of  seal 07011-00032:

Part NO. 07011-00032
Machine Bulldozer
Size OEM
Material PU
Oil seal type SEAL ;OIL

2. 07011-00032  parts on group :

07011-00032 0701100032 HNBR PU FKM Carbon Filled PTFE Multi-Material Composite Oil Seal Kit for Bulldozer Transmission Flow Distribution Valve Complete Overhaul Servicing  S6D155-4C 0

NO. PART NO. PRAT NAME QTY
1 230-65-00186 POWER CONTROL ASSEMBLY 1
2 230-65-00185 POWER CONTROL ASSEMBLY 1
3 230-65-00184 POWER CONTROL ASSEMBLY 1
4 230-65-00183 POWER CONTROL ASSEMBLY 1
5 230-65-00182 POWER CONTROL ASSEMBLY 1
6 230-65-00181 POWER CONTROL ASSEMBLY 1
7 230-65-00180 POWER CONTROL ASSEMBLY 1
8 230-65-00025 CASE ASSEMBLY 1
9 230-65-00024 CASE ASSEMBLY 1
10 230-65-00023 CASE ASSEMBLY 1
11 230-65-00022 CASE ASSEMBLY 1
12 230-65-00021 CASE ASSEMBLY 1
13 230-65-00020 CASE ASSEMBLY 1
14 230-65-11117 CASE 1
15 230-65-11116 CASE 1
16 230-65-11115 CASE 1
17 230-65-11131 BUSHING 2
18 230-65-11120 BUSHING 1
19 230-65-11161 COVER 1
20 01124-30820 STUD 2
21 01100-00820 STUD 2
22 01540-00840 NUT 2
23 01602-00825 WASHER 2
24 230-65-12430 GASKET (KIT) 1
25 230-65-12450 SHIM, 0.1MM 2
26 230-65-12440 SHIM, 0.2MM 4
27 230-65-12460 SHIM, 1.0MM 2
28 01010-31025 BOLT 6
29 01000-31025 BOLT 6
30 01602-01030 WASHER 6
31 07042-00312 PLUG 2
32 07020-00000 FITTING 1
33 230-65-11212 COVER 1
34 230-65-11220 GASKET (KIT) 1
35 01010-30820 BOLT 6
36 01000-30820 BOLT 6
37 01602-00825 WASHER 6
38 07042-00415 PLUG 1
39 230-65-11371 COVER 1
40 230-65-11370 COVER 1
41 230-65-11380 GASKET (KIT) 1
42 01010-31025 BOLT 4
43 01000-31025 BOLT 4
44 01602-01030 WASHER 4
45 07012-00032 SEAL 1
46 07012-00035 SEAL 1
47 230-65-11362 COVER 1
48 230-65-05070 SHIM ASSEMBLY 1
49 230-65-11412 SHIM, 0.1MM 2
50 230-65-11430 SHIM, 0.2MM 4
51 230-65-11391 SHIM, 1.0MM 2
52 01010-31025 BOLT 4
53 01000-31025 BOLT 4
54 01602-01030 WASHER 4
55 230-65-11180 ELBOW 1
56 230-65-11173 TUBE 1
57 230-65-11193 CAP 1
58 07011-00032 SEAL 1
59 230-65-11233 BRACKET 1
60 230-65-11232 BRACKET 1
61 230-65-11231 BRACKET 1
62 230-65-11230 BRACKET 1
63 01010-31230 BOLT 2
64 01602-01236 WASHER 2
65 01010-31235 BOLT 2
66 01000-31235 BOLT 2
67 01580-01210 NUT 2
68 01500-01210 NUT 2
69 01602-01236 WASHER 2
70 01642-01216 WASHER 2

 

3. 07011-00032  picture:

07011-00032 0701100032 HNBR PU FKM Carbon Filled PTFE Multi-Material Composite Oil Seal Kit for Bulldozer Transmission Flow Distribution Valve Complete Overhaul Servicing  S6D155-4C 1
4. Service part number :

PART NO. PART NO. Part NO.
707-98-54500 707-98-54500 707-99-43540
707-98-25760 707-98-36560 707-51-14130
707-99-67830 707-99-75600 707-99-44290
707-99-66610 707-99-73140 707-99-44310
707-51-70030 707-51-95211 707-51-14870
707-51-70110 707-51-10030 707-51-14030
707-51-70211 707-51-10110 707-51-14080
707-51-75030 707-51-10130 707-51-14110
707-51-75110 707-51-10211 707-51-14130
707-51-75211 707-51-11030 707-51-16030
707-98-26600 707-98-38551 707-98-64420
707-98-26200 707-98-37580 707-98-60110
707-98-26300 707-98-37600 707-98-60120
707-98-26441 707-98-37610 707-98-60121
707-98-26450 707-98-37620 707-98-61100

 

5. FAQ

Q: What obvious color and structural appearance differences allow maintenance technicians to quickly distinguish each precision sealing part inside this flow distribution valve oil seal kit?
A: HNBR flow distribution shuttle spool and balance piston main seals are matte jet black with symmetrical double-lip bidirectional dynamic sealing structure, the contact lip surface adopts nano mirror precision polishing without micro burrs or multi-flow switching cyclic abrasion scratches. Flat arched PU flow switching buffer rings are pale apricot yellow with exclusive flat arched shock absorption outline, which can be clearly distinguished from arched rectangular, rounded rectangular and narrow oval PU buffer rings applied to pressure regulating valves, parking brake valves and service brake valves. FKM medium thick static O-rings are dark coffee brown with thick uniform circular cross-section, no shrinkage or permanent micro deformation after long-term multi-flow alternating high-temperature oil soaking storage. Carbon-filled PTFE medium-gap anti-extrusion rings are off-white with evenly scattered tiny black carbon particles on the flat surface, easy to separate from light gray graphite-infused PTFE rings used for narrow-gap miniature pilot valve assemblies. The medium-duty double-layer dust wiper ring is medium-thick black with two layers of scraping lips; the outer layer intercepts large metal friction debris mixed in transmission oil, and the inner fine lip blocks tiny abrasive sludge particles from entering the multi-channel spool gap. Each accessory is printed with clear flow distribution control valve matching dimension marks on the surface for fast sorting and matching during on-site transmission valve assembly.


Q: What wide temperature range and multi-branch flow alternating cyclic pressure hydraulic working conditions can this four-material composite oil seal kit sustain for long-term stable continuous operation?
A: This integrated oil seal kit can steadily bear long-term multi-channel average working pressure up to 435 bar, and withstand repeated instantaneous multi-flow switching bidirectional peak impact pressure up to 492 bar without extrusion failure of sealing components. HNBR and PU components retain stable elastic recovery and bidirectional cyclic sealing performance within -38°C ~ +122°C, fully adapting to sub-zero frozen mountain slope frequent compound action grading in winter and high-temperature continuous long-distance heavy pushing operation in summer. FKM thick O-rings can operate reliably within -26°C ~ +148°C, perfectly matching the ultra-high-temperature alternating-pressure transmission oil circulation state of non-stop open-pit mine stripping construction. Carbon-filled PTFE medium-gap backup rings will not soften or deform under millions of intermittent bidirectional spool sliding friction and frequent cold-hot temperature alternation, maintaining consistent anti-leakage protective performance in all seasonal construction environments.


Q: What hidden multi-channel flow hydraulic circuit failures and corresponding economic losses will customers encounter if they select low-grade inferior oil seal kits instead of this complete multi-material composite set?
A: Cheap inferior oil seal kits only adopt recycled low-grade ordinary NBR raw materials, without matching flat arched PU flow switching impact buffer rings and carbon-filled PTFE medium-gap anti-extrusion protective layers. After millions of frequent multi-flow switching cycles and long-term transmission oil sludge corrosion, the double-lip flow distribution spool sealing lip will symmetrically fatigue and wear thin, triggering internal flow control oil bypass and continuous slow bidirectional external oil leakage of the flow distribution valve assembly. The bulldozer will show uncoordinated blade and steering actions, delayed steering response during heavy pushing, insufficient traction force under compound operation, uneven track left-right output and alternating hydraulic vibration noise every time multiple operating handles are operated simultaneously. Worn rubber and plastic micro debris will flow into the whole transmission hydraulic circuit, scratch the precision polished flow distribution shuttle spool and valve body inner bore, requiring costly full replacement of integral metal flow distribution valve core components, full transmission oil change and all transmission filter element renewal. Meanwhile, persistent slow bidirectional oil seepage increases daily transmission oil consumption costs, and long-term equipment shutdown will delay overall mine and road construction project schedules, bringing extra labor rental and equipment idle loss expenses for customers, and causing uncoordinated movement that raises construction collision risks on narrow mountain roads.

6. Exhibition and Wearhous

14X-13-05110  14X1305110 SERVICE KIT,TORQUE CONVERTER FOR KOMATSU D65EX-12E,D65A-12 1

14X-13-05110  14X1305110 SERVICE KIT,TORQUE CONVERTER FOR KOMATSU D65EX-12E,D65A-12 2

 

14X-13-05110  14X1305110 SERVICE KIT,TORQUE CONVERTER FOR KOMATSU D65EX-12E,D65A-12 3

 

Oil seals,Hydraulic Seals, Cylinders Seal Kits, And More